Raby Cote TES

​

Duration: 12 months

​

We undertook works to carry out 10.5km of Open cut trench at varying depths from 1m to 8.5m to install a new gravity fed 400/450mm ductile Iron main with Pre-fabricated inspection chambers to replace the existing 450mm diameter trade effluent sewer from the Futamura factory in Wigton town centre to the Outfall at Raby Cote farm crossing agricultural land, which included SAC/SSSI areas and flood land.