Great Ayton WwTW
​
Duration: 5 Months
Construction of RC Humus Tank & associated inter connecting pipework
For these works we initially both supplied and installed the steel sheet piles for the octagonal cofferdam within the tight constraints of the existing site. The material was excavated with some being disposed of off site and some of the material being stored on site for reuse. The Humus Tank was constructed insitu utilising bespoke circular shutters before the cofferdam was backfilled and the sheet piles extracted. The works were serviced by our 60t Cat longreach excavator